Poured Wall Construction Quotes

Get Professional Services

Our Trusted Partners
Groundworks
Sunflower Excavating

Cost of Poured Wall Construction in Lees Summit

Poured wall construction is a popular choice for residential and commercial buildings in Lees Summit, MO, thanks to its durability and strength. This method involves pouring concrete into pre-built forms to create solid walls, providing excellent structural integrity. However, the cost of poured wall construction can vary significantly based on several factors.

Factors Affecting Cost

  • Material Costs: The price of concrete and other materials.
  • Labor Rates: Local labor costs in Lees Summit, MO.
  • Wall Thickness: Thicker walls require more material and labor.
  • Site Preparation: Costs for clearing and leveling the site.
  • Project Size: Larger projects may benefit from economies of scale.
  • Complexity of Design: More intricate designs can increase labor and time.
  • Weather Conditions: Adverse weather can delay construction and increase costs.

Average Costs for Common Tasks

Task Average Cost (Lees Summit, MO)
Excavation and Site Prep $1,500 - $3,000
Concrete Material $100 - $150 per cubic yard
Formwork Installation $1,200 - $2,500
Poured Wall Construction $5,000 - $10,000
Reinforcement (Rebar) $500 - $1,200
Waterproofing $1,000 - $2,000
Finishing and Cleanup $800 - $1,500

Poured Wall Construction